New Pool!

Our new swimming pool, a work in progress........22 tonnes of concrete, a 45 metre long concrete pump and a lot of bulldozing, we now need to wait 3 weeks for not to dry before we can do the terrace.
18 Feb

Normandy Gite with a pool

Not finished, but on the way for 2017! Our new swimming pool, a work in progress……..22 tonnes of concrete, a 45 metre long concrete pump and a lot of bulldozing, we now need to wait 3 weeks for not to dry before we can do the terrace.

Leave a Reply